ALÇIPER®
Gypsum-Based Hand Plaster
Ease of Application
APPLICATION FIELD
- Applied on brick,
- Aerated concrete,
- Concrete,
- Fair faced concrete,
- Pumice concrete,
- Briquette walls
- Ceiling surfaces
on interior faces of the buildings.
REQUIREMENTS
- It can be easily applied thanks to its long application time.
- Provides a strong surface with high adhesive resistance and strength.
TECHNICAL VALUES
| Compressive Strength, N/mm² | ≥ 2,0 |
| Bending Strength, N/mm² | ≥ 1,0 |
| Adherence Strength (Under Dry Conditions), N/mm² | ≥ 0,1 |
| Initial Setting Period, minutes | > 50 |
| Reaction to Fire | A1 |
APPLICATION
SURFACE PREPARATION
- The surface will always be free of form oil, dust, paint and materials that reduce adherence.
- Repair of the cracks and holes should be made using appropriate Entegre Repair Mortars before application.
- Application surface should be dampened with water, if required. PRİMEL 600® BETOKONTAK is used for adherence increasing primer before application on bright fair faced surfaces, concrete ceilings and walls.
- You can advance to application when the surface is cured.
PREPARATION of the MORTAR
- Water will be put to the mixing vessel first, then ALÇIPER® should be added (17-18 l water/35 kg bag) and it should be stirred until the lumps are removed.
- Stop for 5 minutes, and stir again to achieve a homogeneous mixture.
- Application thickness should be between 8 mm and 2.5 cm in one coat. If the thickness is more than 2.5 cm, a second coat is applied in max. 2.5 cm thickness before the first coat is set.
- The mortar prepared should be applied with a mortar board or a plastering trowel. Then, the surface must be levelled.
- ALCIPER® and SATENPER® will be mixed and applied on the surface.
- In order to finish the surface and prepare it for painting, the surface should be smoothed with a final coat of SATENPER® after the hardening of the surface.
CONSUMPTION
Approx. 10,0 kg/m² for 1 cm of plaster thickness
PACKAGING
35 kg PP Bag,
(delivered in pallets or as sling-bags upon request.)
STORING
6 Months Shelf Life*
* If stored in its original package without opening the package under dry, frost free conditions
(1 week after opening the package.)
CERTIFICATE OF CONFORMITY
TS EN 13279-1 / February 2009 / B4-50-2.0
Ministry of Public Works Pos. No: 04.737/H
RECOMMENDATION
- No other materials (lime, cement, gypsum, etc.) should be added to the prepared mortar.
- We recommend the application to be performed between +5°C and +35°C.
- ALCIPER® will be protected against quick drying under windy weather conditions.
- We recommend using fiberglass meshs on the joining areas of different materials and on the points that may be considered to be moving.
- You should wait at least 10 days for the application be performed on the ALCIPER® depending on the ambient temperature.
- Do not go beyond the application field and the rules.
- Do not inhale it directly. Wash your eyes with plenty of water in case of contact with eyes, seek medical attention if required.
- For detailed information, please request the safety data sheet.
- Contact us for your technical questions and for your questions about all other application conditions.